Skip to main content

Table 5 Results for I40

From: Multilevel hybrid method for optimal buffer sizing and inspection stations positioning

m

ESM cost

MHH cost

Running time (s)

ESM

MHH/Best

MHH

1

25.2938

25.2938

109,147

194.46

387.83

2

16.0119

16.1078

1105,72

1008.23

1013.94

3

13.3200

13.3208

13,200,38

2336.34

2623.08

4

 

12.5685

 

3932.31

5827.07

5

 

12.3450

 

6092.55

6920.45

6

 

12.5043

 

5266.51

11,511.62

7

 

12.6973

 

10,604.86

16,425.48

8

 

12.8781

 

18,929.32

23,346.94

9

 

13.1145

 

12,666.15

25,374.23

10

 

13.3623

 

15,501.52

31,699.22

  1. Italic values indictate optimal costs