From: Multilevel hybrid method for optimal buffer sizing and inspection stations positioning
m | ESM cost | MHH cost | Running time (s) | ||
---|---|---|---|---|---|
ESM | MHH/Best | MHH | |||
1 | 25.2938 | 25.2938 | 109,147 | 194.46 | 387.83 |
2 | 16.0119 | 16.1078 | 1105,72 | 1008.23 | 1013.94 |
3 | 13.3200 | 13.3208 | 13,200,38 | 2336.34 | 2623.08 |
4 | 12.5685 | 3932.31 | 5827.07 | ||
5 | 12.3450 | 6092.55 | 6920.45 | ||
6 | 12.5043 | 5266.51 | 11,511.62 | ||
7 | 12.6973 | 10,604.86 | 16,425.48 | ||
8 | 12.8781 | 18,929.32 | 23,346.94 | ||
9 | 13.1145 | 12,666.15 | 25,374.23 | ||
10 | 13.3623 | 15,501.52 | 31,699.22 |