Fig. 7From: Analysis of Poyang Lake water balance and its indication of river–lake interactionThe changes of streamflow before and after the operation of TGD in the Yangtze River (a inflow and outflow of TGD and corresponding water level; b comparison between the observed Poyang Lake outflow (streamflow of Hukou station) and reconstructed lake outflow (streamflow of Datong minus Jiujiang); c observed minus reconstructed lake outflow)Back to article page