Skip to main content

Table 5 Averaged percentage difference between corresponding grid-wise morphometric values across the different datasets for four select parameters

From: Evaluation of different digital elevation models for analyzing drainage morphometric parameters in a mountainous terrain: a case study of the Supin–Upper Tons Basin, Indian Himalayas

Difference from

Difference computation

Averaged percentage difference

Mean elevation

Relative relief

Slope

Drainage density

A30

A30–A90

−4.11

5.07

7.92

34.27

A30–C30

1.67

7.86

5.25

−11.69

A30–C90

−2.40

14.50

16.65

31.13

A30–S90

0.08

6.72

6.19

53.51

A30–T50D

−0.05

13.05

11.47

69.78

A30–T250D

2.74

14.58

15.47

63.24

A30–T50A

−0.48

6.66

−9.14

54.85

A30–T250A

2.69

27.77

1.12

87.56

A90

A90–C30

1.48

−19.07

−18.85

−504.00

A90–C90

1.58

8.17

7.93

−70.47

A90–S90

−0.12

−22.34

−19.48

−186.39

A90–T50D

−0.24

−13.06

−12.25

−67.20

A90–T250D

2.82

−4.72

−2.83

−98.14

A90–T50A

−0.65

−21.70

−37.34

−124.36

A90–T250A

2.77

10.51

−20.11

35.06

C30

C30–C90

−4.16

5.72

11.09

38.45

C30–S90

−1.65

−4.84

−1.28

55.52

C30–T50D

−1.77

2.64

4.57

71.10

C30–T250D

1.10

5.63

9.75

65.97

C30–T50A

−2.22

−4.72

−17.82

58.67

C30–T250A

1.04

20.13

−5.61

88.51

C90

C90–S90

−1.71

−36.30

−31.12

−293.65

C90–T50D

−1.83

−26.08

−23.10

−188.21

C90–T250D

1.30

−17.21

−13.02

−76.93

C90–T50A

−2.25

−35.80

−50.84

−116.31

C90–T250A

1.24

−0.18

−31.80

30.39

S90

S90–T50D

−0.12

6.54

5.55

28.85

S90–T250D

2.66

7.03

8.49

−72.73

S90–T50A

−0.56

−0.48

−16.71

−71.97

S90–T250A

2.61

21.32

−6.97

58.97

T50D

T50D–T250D

2.79

−5.73

0.17

−123.76

T50D–T50A

−0.45

−7.67

−23.72

−159.61

T50D–T250A

2.74

9.09

−16.37

31.33

T250D

T250D–T50A

−4.46

−88.98

−103.15

−187.97

T250D–T250A

−0.05

−60.11

−24.68

56.10

T50A

T50A–T250A

3.12

11.96

−18.57

49.16

  1. The difference between corresponding values of two parameters for each of the 1154 one sqkm grids overlain across the basin surface has been first computed. Then the % difference was computed, again for each of these grids, by dividing the computed difference for each by the corresponding parameter value from which the subtraction is done, multiplied by 100. The mean of these % difference values for the 1154 grids has then been tabulated here