From: A split-optimization approach for obtaining multiple solutions in single-objective process parameter optimization
Number of hills
Number of valleys
Sub-range of voltage (V)
Sub-range of pulse on time (µs)
Sub-range of feed rate (µm/s)
Number of sub-search spaces
29
14
[8, 9]; [9, 10]; [10, 18]; [18, 20]
[25,50]; [50,60]; [60,70]
[4, 6]; [6, 8]
24