Skip to main content

Table 8 The Delta of each parameter

From: Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization

Factor

N

ω

(c 1, c 2)

c 3

1

28.55

28.50

28.40

28.60

2

28.95

28.90

28.75

28.30

3

28.65

28.75

28.50

28.65

4

28.50

28.50

29.00

28.80

Delta

0.45

0.40

0.60

0.5