From: Dynamic bottleneck elimination in mattress manufacturing line using theory of constraints
Scenario | Buffer stock | Type A | Type B | Type C | Type D | Type E | Average* | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Average | Half-width | Average | Half-width | Average | Half-width | Average | Half-width | Average | Half-width | |||
S9 | S8 + After fabric quilting and Gluing | 375.53 | 0.95 | 556.80 | 1.00 | 310.63 | 0.83 | 310.16 | 0.93 | 309.66 | 0.90 | 372.56 |