Skip to main content

Advertisement

Table 6 Average production quantities and half-width values of iterative resource capacity simulation runnings

From: Dynamic bottleneck elimination in mattress manufacturing line using theory of constraints

Scenario Resource capacity Type A Type B Type C Type D Type E Average*
Average Half-width Average Half-width Average Half-width Average Half-width Average Half-width
Present r1 = 2, r2 = 2, r3 = 1, r4 = 1, r5 = 1, r6 = 2, r7 = 2, r8 = 2 165.90 0.49 323.06 0.81 165.50 0.42 165.40 0.42 165.36 0.55 197.04
S1 r1 = 3, r2 = 2, r3 = 1, r4 = 1, r5 = 1, r6 = 2, r7 = 2, r8 = 2 185.43 0.57 325.30 0.69 166.76 0.25 167.16 0.45 191.36 0.33 207.20
S2 r1 = 3, r2 = 3, r3 = 1, r4 = 1, r5 = 1, r6 = 2, r7 = 2, r8 = 2 186.46 0.59 325.80 0.70 166.76 0.25 167.16 0.45 192.30 0.34 207.70
S3 r1 = 4, r2 = 3, r3 = 1, r4 = 1, r5 = 1, r6 = 2, r7 = 2, r8 = 2 187.46 0.54 325.80 0.70 166.76 0.25 167.16 0.45 193.60 0.41 208.16
S4 r1 = 3, r2 = 2, r3 = 1, r4 = 1, r5 = 2, r6 = 2, r7 = 2, r8 = 2 237.16 0.80 358.66 1.00 166.76 0.25 167.16 0.45 197.50 0.72 225.45
S5 r1 = 4, r2 = 3, r3 = 1, r4 = 1, r5 = 2, r6 = 3, r7 = 2, r8 = 2 331.93 0.76 490.00 1.00 166.83 0.28 167.23 0.44 297.16 0.91 290.63
S6 r1 = 4, r2 = 3, r3 = 1, r4 = 2, r5 = 1, r6 = 2, r7 = 2, r8 = 2 187.46 0.54 325.80 0.70 191.10 0.20 191.40 0.32 193.60 0.41 217.87
S7 r1 = 4, r2 = 3, r3 = 1, r4 = 2, r5 = 2, r6 = 2, r7 = 2, r8 = 2 242.40 0.96 360.46 1.00 197.90 0.55 198.03 0.65 200.10 0.76 239.78
S8 r1 = 4, r2 = 3, r3 = 1, r4 = 2, r5 = 2, r6 = 3, r7 = 2, r8 = 2 331.93 0.76 490.00 1.00 296.76 0.73 296.76 0.90 297.16 0.91 342.52