Skip to main content

Table 4 Visibility influence coefficient

From: A maintenance time prediction method considering ergonomics through virtual reality simulation

No

Visibility description

Scope analysis area

Visibility level

Influence coefficient

1

Maintenance objects and internal operations can directly be seen during the whole maintenance process

15° scope cone

Good

1

2

Before maintenance activities, can see maintenance objects directly, but the maintenance operation is invisible due to physical or maintenance equipment/tools block

35° scope cone

Normal

1.3

3

Maintenance objects and internal operations are not directly seen the entire maintenance process, mainly depend on the experience, feeling and skill level

Other scope cone

Bad

1.5