Skip to main content

Table 12 Basic maintenance time measurement results and comparison of three groups

From: A maintenance time prediction method considering ergonomics through virtual reality simulation

Num

Item name

Basic maintenance work

Basic MOD value

Basic consumption time/s

Proportion for actual time (%)

Corrective MOD value

Corrective consumption time/s

Proportion for actual time (%)

Actual consumption time/s

1

Going up the 788operation platform

595

76.755

90.542

639

82.431

97.237

84.773

2

Opening seven cap locks

235

30.315

80.599

282

36.378

96.719

37.612

3

Opening the left side cabin door

55

7.095

62.788

78

10.062

89.044

11.300

4

Opening the right side cabin door

55

7.095

70.5

78

10.062

89.044

11.300

5

Screwing 8 hexagon bolts

415

53.535

50.702

837

107.973

102.260

105.587

6

Screwing APU

18

2.322

61.920

25

3.225

86

3.750

7

Moving cables

49

6.321

59.380

74

9.546

89.676

10.465

8

Putting APU to the operation platform

149

19.221

61.028

233

30.057

95.483

31.479

Total

 

1571

202.659

68.404

2246

289.734

97.795

296.266