Skip to main content

Table 6 Projection point and excess quantity of input

From: Measuring the operational efficiency of individual theme park attractions

DMU Input factor
Excess quantity of input (%) Projection point (%)
X1 X2 X3 X1 X2 X3
T Express 96.11 96.60 96.05 3.89 3.40 3.95
Double Rock Spin 74.94 74.94 90.91 25.06 25.06 9.09
Amazon Express 95.64 83.72 84.90 4.36 16.28 15.10
Let’s Twist 68.23 82.81 68.33 31.77 17.19 31.67
Rolling X-Train 96.95 88.45 90.10 3.05 11.55 9.90
Championship Rodeo 66.69 84.46 24.00 33.31 15.54 76.00
Flying Rescue 0.00 0.00 0.00 100.00 100.00 100.00
Lily Dance 18.39 18.38 68.42 81.61 81.62 31.58
Global Village 91.53 91.53 95.97 8.47 8.47 4.03
Sky Dancing 56.88 62.19 57.14 43.12 37.81 42.86
Flying Elephant 0.00 0.00 0.00 100.00 100.00 100.00
Peter Pan 0.00 0.00 0.00 100.00 100.00 100.00
Top Jet 41.78 63.87 5.56 58.22 36.13 94.44
Flash Bang Bang 20.04 20.04 73.33 79.96 79.96 26.67
Royal Jubilee Carousel 58.11 64.71 57.63 41.89 35.29 42.37
  1. X1 installation area, X2 installation cost, X3 annual repair cost