Fig. 9From: Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, ChinaDrainage measures in the diversion tunnel: a installing of drainage pipe and b water catchment in the drainage tunnel before drainingBack to article page