Fig. 5From: Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, ChinaWater inrush disasters in the diversion tunnel during the construction process: a low flow water inrush; b large flow water inrush; c water inrush with silt; and d water inrush from a structural surfaceBack to article page