Fig. 3From: Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, ChinaRainfall data of the study area: a annual rainfall range from 1960 to 2012; b comparison of the monthly rainfall of 2011, 2012 and 2013Back to article page