Fig. 2From: Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, ChinaGeological condition of the longitudinal profile for the #2 diversion tunnel at the Jinping II Hydropower Station: a gross section; b original excavation section; and c lining sectionBack to article page