Fig. 11From: Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, ChinaSimulated results of the groundwater pressure head at different locations: a section of K12 + 737 to K12 + 744; and b section of K13 + 785 to K13 + 831Back to article page