Skip to main content

Table 2 Comparison of measured data and calculated results

From: Analytical modeling of gas production rate in tight channel sand formation and optimization of artificial fracture

Production well no.

Pressure drawdown/MPa

Tested Max. permeability/m2

Permeability ratio

Measured production rate/104 m3/day

Calculated production rate/104 m3/day

Anisotropic

Difference rate/%

Isotropic

Difference rate/%

Shan 319

7.59

0.663 × 10−15

9

33.08

37.45

13.2

39.65

19.9

Shan 356

12.01

0.789 × 10−15

2

50.39

54.07

7.3

59.63

18.3

Shan 361

10.19

0.054 × 10−15

7

10.24

11.65

13.8

13.02

27.1

Su 124

7.99

0.42 × 10−15

6

36.95

40.85

10.6

43.36

17.3

Su 192

7.94

0.06 × 10−15

8

11.44

12.39

8.3

13.62

19.1