Skip to main content

Table 3 Thresholds for maintenance of some lines of Beijing subway (unit: mm)

From: Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China

Type

Item

Planned maintenance

Regular maintenance

Line

Gauge

Main line

Other line

Main line

Other line

Horizontal

+4, −2

+5, −2

+6, −3

+7, −3

Vertical

4

5

6

8

Direction (line)

4

5

6

8

Twist

    

 Transition curve

4

5

6

8

 Branch line and circular line

4

5

6

8

Turnout

Gauge

    

 General place

+3, −2

+3, −2

+4, −3

+4, −3

 Sharp end of switch rail

3

4

5

7

Horizontal

3

4

5

7

Vertical

3

4

5

7

Direction

    

 Line

3

4

5

7

 Offset

2

2

3

3