Fig. 5From: Producer–retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policyOn-hand Inventory level of finished products at the retailer’s side in the extended EMQ model 2 with breakdown occurrenceBack to article page