Skip to main content

Table 3 The calculation results in different stations

From: Time prediction model of subway transfer

Group no.

N (p/min)

L 1 (m)

B 1 (m)

v 1 (m/s)

p 1 (p/m s)

L 2 (m)

B 2 (m)

v 2 (m/s)

p 2 (p/m s)

1

6

2.80

11.50

1.73

0.01

88.50

4.50

1.29

0.02

2

9

3.20

9.00

1.26

0.02

123.00

3.50

1.26

0.04

3

15

2.60

10.50

1.40

0.02

142.50

4.50

1.21

0.06

4

29

3.50

8.50

1.53

0.06

105.50

4.50

1.14

0.11

5

33

3.30

8.00

1.45

0.07

152.50

4.50

1.12

0.12

6

34

4.20

6.50

1.48

0.09

115.50

4.50

1.10

0.13

7

43

4.00

6.00

1.34

0.12

133.00

3.50

1.07

0.20

8

64

3.50

6.00

1.24

0.18

97.00

4.50

1.03

0.24

9

82

3.50

6.00

1.76

0.23

97.00

4.50

0.94

0.30

10

96

4.20

6.50

1.23

0.25

115.50

4.50

0.96

0.36

11

105

2.60

10.50

1.43

0.17

142.50

4.50

0.94

0.39

12

110

4.00

6.00

1.19

0.31

133.00

3.50

0.89

0.52

13

122

3.20

9.00

1.41

0.23

123.00

3.50

0.91

0.58

14

143

3.30

8.00

1.24

0.30

152.50

4.50

0.83

0.53

15

151

2.80

11.50

1.39

0.22

88.50

4.50

0.81

0.56

16

158

3.50

8.50

1.29

0.31

105.50

4.50

0.80

0.59

Group no.

L 3 (m)

B 3 (m)

v 3 (m/s)

p 3 (p/m s)

T (s)

T tr (s)

Error rate (%)

1

24.00

1.20

0.50

0.08

190.76

191

0.13

2

28.00

1.10

0.50

0.14

334.73

343

2.41

3

25.00

1.20

0.50

0.21

307.56

307

0.18

4

25.00

1.10

0.60

0.44

228.10

231

1.26

5

25.00

1.20

0.60

0.46

316.25

333

5.03

6

25.00

1.10

0.50

0.52

249.65

241

3.59

7

28.00

1.10

0.60

0.65

348.78

339

2.88

8

24.00

1.20

0.50

0.89

214.93

224

4.05

9

24.00

1.20

0.49

1.14

223.37

236

5.35

10

25.00

1.10

0.46

1.45

270.50

255

6.08

11

25.00

1.20

0.41

1.46

351.75

359

2.02

12

28.00

1.10

0.38

1.67

397.62

408

2.54

13

28.00

1.10

0.38

1.85

386.48

388

0.39

14

25.00

1.20

0.31

1.99

402.03

442

9.04

15

24.00

1.20

0.28

2.10

270.76

256

5.77

16

25.00

1.10

0.27

2.39

317.34

335

5.27

  1. T tr true time measured by the survey