From: Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date
\(\mu\)
ACS
vs
GA
SA
0.8
6.32
12.64
1.06
16.48
1.27
17.54
0.9
8.89
9.84
1.70
15.33
1.63
16.99
1.1
0.13
1.77
0.42
1.74
0.69
0.41
1.2
0.02
0.16
0.20
0.17
0.03