From: Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date
\(\mu\)
\(TimeAvg^*\)
GA
SA
ACS
LPT
LS
LDF
0.8
6.1848
3.1833
39.1215
0.0014
0.0015
0.9
6.2162
3.1991
39.5560
0.0013
1.1
0.7111
1.0418
9.8085
1.2
0.1909
0.6536
1.5389
0.0016