From: Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date
m
\(TimeAvg^*\)
GA
SA
ACS
LPT
LS
LDF
2
1.1111
0.5938
1.8501
0.0005
3
1.6686
0.7714
4.9555
0.0008
0.0007
5
3.5004
1.7310
24.6330
0.0013
0.0014
0.0017
10
7.0229
4.9816
58.5864
0.0030
0.0028
0.0031