Fig. 4From: Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due dateComparison results in \({Y}'Avg^*\) merged by p. This figure shows the comparison results of six algorithms in \({Y}'Avg^*\) which are merged by \({Y}'Avg\) with the same p. \({Y}'Avg\) is denoted as the average value of \({{Y}_{w}}/\sum \nolimits _{i=1}^{n}{{{p}_{i}}{{w}_{i}}}\) Back to article page