Figure no. | Fixed parameter | Comparison with respect to | Which model is better (according to different situations) | ||
---|---|---|---|---|---|
Model 1 is better if | Model 2 is better if | Both the models are equally good | |||
4 | γ1 = 0.008/hr, γ2 = 0.235/hr, γ3 = 0.353/hr, γ4 = 0.4213/hr, α = 0.05/hr, β1 = 0.002/hr, p1 = 0.665, p2 = 0.335, C2 = INR 500, C1 = INR 700, C3 = INR 400, ICA = INR 500, λ = 0.003/hr | Availability (AD) when d ≥ p | λ > 0.3903 | λ < 0.3903 | λ = 0.3903 |
5 | Profit | ||||
C4Â =Â 100 | C0Â <Â 728.173 | C0Â >Â 728.173 | C0Â =Â 728.173 | ||
C4Â =Â 600 | C0Â <Â 574.291 | C0Â >Â 574.291 | C0Â =Â 574.291 | ||
C4Â =Â 1100 | C0Â <Â 352.178 | C0Â >Â 352.178 | C0Â =Â 352.178 | ||
6 | λ = 0.003/hr, α = 0.05/hr, γ1 = 0.008/hr, γ2 = 0.23/hr, γ3 = 0.353/hr, γ4 = 0.4213/hr, β1 = 0.002/hr, p1 = 0.665, p2 = 0.335, C0 = INR 7000, C1 = INR 700, C4 = INR 400, ICA = INR 500 | Profit | |||
C3Â =Â 200 | C2Â >Â 574.248 | C2Â <Â 574.248 | C2Â =Â 574.248 | ||
C3Â =Â 10,200 | C2Â >Â 478.789 | C2Â <Â 478.789 | C2Â =Â 478.789 | ||
C3Â =Â 20,200 | C2Â >Â 391.432 | C2Â <Â 391.432 | C2Â =Â 391.432 | ||
7 | λ = 0.003/hr, α = 0.05/hr, γ2 = 0.235/hr, γ3 = 0.353/hr, γ4 = 0.4213/hr, β1 = 0.002/hr, p1 = 0.665, p2 = 0.335, C2 = INR 500, C0 = INR 7000, C3 = INR 400, C4 = INR 400, ICA = INR 500, γ1 = 0.008/hr | Profit | C1 < 202.594 | C1 > 202.594 | C1 = 202.594 |
8 | λ = 0.003/hr, α = 0.05/hr, γ1 = 0.008/hr, γ2 = 0.235/hr, γ3 = 0.353/hr, γ4 = 0.4213/hr, β1 = 0.002/hr, p1 = 0.665, p2 = 0.335, C2 = INR 500, C0 = INR 7000, C3 = INR 400, C4 = INR 400, C1 = INR 700 | Profit | ICA > 1632.46 | ICA < 1632.46 | ICA = 1632.46 |