|
2002
|
2003
|
2004
|
2005
|
2006
|
2007
|
2008
|
2009
|
2010
|
2011
|
MEAN
|
---|
P [mm]
|
168.2
|
300.8
|
160.9
|
141.7
|
136.3
|
141.4
|
162.1
|
116.4
|
150.5
|
174.6
|
165.29
|
ET [mm]
|
167.5
|
198.6
|
165.4
|
145.5
|
139.6
|
145.8
|
165.1
|
119.2
|
154.5
|
179.7
|
158.09
|
T [mm]
|
89.7
|
113.0
|
92.7
|
83.3
|
80.2
|
79.2
|
88.1
|
69.4
|
91.1
|
102.4
|
88.91
|
E [mm]
|
66.8
|
73.5
|
61.3
|
54.4
|
50.5
|
59.1
|
66.0
|
44.7
|
56.5
|
63.6
|
59.64
|
Ei [mm]
|
11.0
|
12.1
|
11.4
|
7.8
|
8.9
|
7.5
|
11.0
|
5.1
|
6.9
|
13.7
|
9.54
|
VRFL [mm]
|
13.7
|
77.3
|
10.9
|
3.8
|
4.2
|
3.5
|
8.8
|
1.5
|
14.1
|
18.6
|
15.64
|
P-ET-VRFL [mm]
|
−13.0
|
24.90
|
−15.40
|
−7.60
|
−7.50
|
−7.90
|
−11.80
|
−4.30
|
−18.10
|
−23.70
|
−8.44
|
ET/P
|
0.99
|
0.66
|
1.03
|
1.03
|
1.02
|
1.03
|
1.02
|
1.02
|
1.03
|
1.03
|
0.99
|
T/ET
|
0.54
|
0.57
|
0.56
|
0.57
|
0.57
|
0.54
|
0.53
|
0.58
|
0.59
|
0.57
|
0.56
|
- Note VRFL is the vertical flow through the parameterised soil and P-ET-VRFL corresponds to the change in soil moisture during that time.