From: A CMMI-based approach for medical software project life cycle study
No | Description |
---|---|
REQM-N-001 | The requirements should base on project purposes to define needs from users and functions. All processes should have control documents. |
REQM-N-002 | The control documents should have acceptance criteria, notation description and priority definition. |
REQM-F-001 | The system introduction should have description, operational concept and its requirements list. The major types of requirement are interface, functional, non-functional, performance, test and others. |